FAQs - Peyton Forest

FAQs - Peyton Forest, Beecher Hills, and West Manor
Enrollment
QUESTION: Do you have updated enrollment projections for the proposed Peyton Forest ES rezoning scenario? Beecher Hills ES families are developing their own estimates based on unverified figures, so sharing the district’s official projections would help everyone better understand the proposal.
APS is continuing to evaluate enrollment and capacity projections associated with the proposed Peyton Forest Elementary rezoning scenario and the community-developed modified option.
Under the modified option, moving only the Harland Terrace neighborhood would help keep Beecher Hills Elementary below 100% utilization. However, that change is projected to push West Manor Elementary above 105% utilization for at least the next five years, and potentially longer.
One important factor is the number of students currently attending each school through transfers. West Manor has fewer students transferring in from outside its attendance zone, which means there is less enrollment expected to decline naturally over time as existing transfers phase out.
Under the current proposal, Beecher Hills Elementary is projected to exceed 100% utilization only during the 2027–28 and 2028–29 school years. After that period, utilization is expected to fall below 100% as existing transfers phase out and could fall below 90% by the 2030–31 school year.
From a long-term capacity-planning perspective, the current proposal creates a shorter-term capacity challenge at Beecher Hills while avoiding a more sustained overcapacity issue at West Manor Elementary.
APS is also actively exploring additional adjustments that could reduce Beecher Hills’ projected utilization beginning in the 2027–28 school year. We will continue evaluating viable options with the goal of maintaining strong, well-supported and stable learning environments for students across both school communities.
Capacity
1. How was capacity calculated for the Mays Feeder Pattern in the 2022 facilities assessment?
In 2022, APS used a different capacity methodology than the one used today. Capacity was based on the number of “core” classrooms available for general instruction after accounting for dedicated instructional spaces and adjustments associated with the Student Success Formula (SSF).
For example, Beecher Hills Elementary has 27 total instructional units (IUs). Under the 2022 methodology, seven instructional units were designated for non-core uses:
| Type | IUs |
|---|---|
| Music | 1 |
| Art | 1 |
| Media | 1 |
| Science | 1 |
| Self-Contained Classrooms | 2 |
| Gym | 1 |
| Total | 7 |
In addition, three classrooms were set aside based on English Language Learner (ELL) and poverty-related SSF adjustments intended to support smaller class sizes.
That resulted in:
27 total IUs – 7 non-core IUs – 3 SSF-adjusted IUs = 17 core classrooms
The final capacity was then calculated using weighted class-occupancy factors by grade level:
-
Grades K–3: 21 students per classroom
-
Grades 4–5: 23 students per classroom
Using those assumptions, Beecher Hills’ calculated capacity was approximately 368 students.
2. How is capacity being calculated for the current Forward 2040 analysis?
For the current Forward 2040 analysis, APS uses a methodology aligned with Georgia Department of Education instructional-unit allocations.
Capacity is based on the total number of instructional units at a school and the grade levels served. GaDOE provides a capacity range—low, mid-range and high—based on those factors, and APS uses the mid-range capacity for planning purposes.
For example, a school with 26 to 29 instructional units has a capacity range of 413 to 437 students, with a mid-range capacity of 425 students.
3. What assumptions changed between the 2022 methodology and the current methodology?
The primary difference is how instructional space is treated.
The 2022 methodology incorporated several APS-specific adjustments, including:
-
English Language Learner enrollment
-
Gifted enrollment
-
Poverty-related Student Success Formula adjustments
-
A fixed number of spaces designated for non-core instructional uses
The current methodology uses the total number of instructional units and applies the GaDOE capacity framework based on school size and grade configuration.
As a result, the current approach does not make the same school-by-school classroom deductions that were included in the 2022 calculation.
4. When did the methodology change, and why?
APS adopted the current methodology at the beginning of the Comprehensive Facilities Plan process in April 2025.
The change was made to provide a more standardized, consistent and easily understood method for calculating capacity across schools. Using the GaDOE framework also gives APS a common reference point for evaluating school capacity as part of long-term facilities and enrollment planning.
5. Was the same methodology applied consistently across all APS schools?
Yes. The same capacity methodology is applied consistently across APS schools as part of the Forward 2040 analysis.
Facilities
QUESTION: The Mays Feeder Pattern seems to be missing a significant project in the E-SPLOST proposal. Southwest Atlanta has high voter turnout, and families want to see meaningful investment in their schools. Therrell’s new stadium and Harper-Archer’s planetarium restoration are exciting projects, but neither directly serves the Mays Feeder Pattern. Young’s proposed upgrades are much needed, but I don’t see a major project that signals a new era for our cluster. Would you be open to Mays Feeder Pattern families submitting proposals for that kind of investment?
APS recognizes that Mays Feeder Pattern families want to see continued, meaningful investment in their schools, and we welcome community feedback as the proposed E-SPLOST 2027 project list moves forward.
Over the past three E-SPLOST cycles, schools in the Mays Feeder Pattern have benefited from significant site-specific investments, including improvements at Beecher Hills Elementary, West Manor Elementary and Mays High School, as well as investments at Cascade Elementary and Miles Elementary during the current E-SPLOST 2022 cycle.
These investments have contributed to the overall condition of facilities across the feeder pattern. Today, Mays Feeder Pattern schools have an average Facilities Condition Assessment (FCA) score of 94.1, placing the feeder pattern among the strongest in the district from a facilities-condition standpoint.
As APS plans for E-SPLOST 2027, Young Middle School has been identified as needing significant infrastructure investment, particularly related to its HVAC system and roof. The proposed E-SPLOST program would also support additional facility improvements at Young based on identified needs.
It is also important to note that E-SPLOST investment extends beyond major, site-specific construction projects. Funding proposed for districtwide priorities—including instructional materials and textbook adoptions, band equipment, technology, transportation, athletics, facility infrastructure, and safety and security—will benefit students and schools throughout the Mays Feeder Pattern.
The E-SPLOST 2027 project list is proposed, and APS will continue to listen to families and community members as we plan for the district’s long-term facility and capital needs.